Photo dataCameraCanon PowerShot G10Focal length6mmAperturef/2.8Shutter1/8sISO400Taken28 Aug 2009, 17:36
The old route through the Ginza to the left, but today we tried the new C2 road
On the way back from golf the other day, we drove through the Yamate Tunnel which currently runs from Ikebukuro through Shinjuku, and will eventually come out near Shibuya at Ohashi Junction.
Photo dataCameraCanon PowerShot G10Focal length6mmAperturef/4Shutter1/200sISO80Taken28 Aug 2009, 17:34Watch out for guys dressed in green running across the road !advance warning of the 5.9% gradient as way enter the tunnelPhoto dataCameraCanon PowerShot G10Focal length6mmAperturef/4Shutter1/320sISO80Taken28 Aug 2009, 17:35this time we are being told about a traffic jam up at aheadthe descent into the tunnel. We have a green light for goPhoto dataCameraCanon PowerShot G10Focal length6mmAperturef/4Shutter1/100sISO80Taken28 Aug 2009, 17:35time to to put the lights on and hit the Yamate Tunnel for 5800 metresThere is good lighting when you first hit the tunnel to help adjust your eyesPhoto dataCameraCanon PowerShot G10Focal length6mmAperturef/2.8Shutter1/8sISO400Taken28 Aug 2009, 17:36As we get further in, the walls rush by in a blurYou can make out another light patch aheadnot sure why the lights were brighter here, but wasnt getting out to checkafter some underground tunneling we finally hit the traffic jam at an exit rampPhoto dataCameraCanon PowerShot G10Focal length6mmAperturef/4Shutter1/60sISO80Taken28 Aug 2009, 17:50we surface a bit further along the route near Opera City, Hatsudaifriendly sign telling us of a sudden curve that requires us to slow downmore warnings for the sudden curvePhoto dataCameraCanon PowerShot G10Focal length6mmAperturef/2.8Shutter1/60sISO200Taken28 Aug 2009, 18:09as we turn off Inokashira-dori and onto Yamate dori, here are the exhaust towers that are being built along the latest part of the tunnel route
Whilst we are driving above ground here, when the Ohashi Junction section is finished, you will be able to not get off at Hatsudai but keep underground and travel all the way close to Shibuya.
The section of the road to be built after that should take you down past Shinagawa, to the Oi Junction and then onto Haneda Airport or Yokohama.
Compared to the photos I took from the air, these towers look even bigger on the groundPhoto dataCameraCanon PowerShot G10Focal length6mmAperturef/2.8Shutter1/60sISO125Taken28 Aug 2009, 18:10more smoke stacks. wonder what the residents of the adjacent buildings think?Finally we come along Route 246 to Shibuya
5 comments
Comments are closed. These are from readers when the post was first published.
Clement
Everytime I go through this tunnel, I experience a traffic jam. The last time it was too bad.
2nihon
Thanks for the virtual drive-through!
shibuya246
Yeah, I hope when they finish the Ohashi Junction section that the traffic jam gets less, but I think it might get worse :)
Numer0bis
thank you very much for the google street view experience. Loved it.
salvidali
the tunnel reminds me of driving the Oakland Bay bridge into San Francisco - is a bit claustrophobic and makes me nervous . . .